§ 305.7. Services performed by the Recipient's own forces.
146 words·~1 min read·
/us/cfr/t13/s§ 305.7·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
In certain circumstances, the Recipient may wish to consider having a portion or all of the design, construction, inspection, legal services or other work and/or services in connection with the Project performed by personnel who are employed by the Recipient either full-time or part-time. EDA may approve the use of such "in-house forces" if:
(a)The services are routinely performed by the Recipient for all construction Projects performed by the Recipient (for example, inspection or legal); or
(b)The Recipient has a special skill required for the construction of the Project (for example, construction of unique Indian structures); or
(c)The Recipient has made all reasonable efforts to obtain a contractor but has failed to do so because of uncontrollable factors such as the remoteness of the Project site or an overabundance of construction work in the Region; or
(d)The Recipient demonstrates substantial cost savings.